Kigali International Airport — Runway Strip Grading
Runway strip grading to improve surface conditions and ensure compliance with aviation safety standards — enhancing drainage and stability around the runway area.

Eight projects across nine districts — airports, warehouses, roads, culverts and mall foundations, worth 13.6B+ RWF delivered.
From runway grading at Kigali International Airport to box culverts and warehouse builds — a portfolio delivered as main contractor and trusted sub-contractor.
8 projects · 13.6B+ RWF
Runway strip grading to improve surface conditions and ensure compliance with aviation safety standards — enhancing drainage and stability around the runway area.

Excavation works preparing the site for the mall's foundation and structural development — precise earth removal for large-scale construction.

A large-scale warehouse facility including structural works and finishing — a modern storage solution supporting logistics and industrial operations.

A multicell box culvert facilitating proper water flow and preventing flooding — improving drainage efficiency and protecting the road infrastructure.

Rehabilitation improving structural integrity and usability — earthworks, grading, and restoration of damaged sections to enhance accessibility.

Extensive grading works preparing the site for the peat power plant infrastructure, including land leveling and compaction to ensure a stable foundation.

Major earthworks including excavation, grading, and sub-base preparation — a durable, well-structured foundation for road construction.

Earthworks and drainage installation supporting the road construction — improving water management and ensuring the long-term durability of the roadway.
We deliver across Rwanda as main contractor and trusted sub-contractor alike.